AREVA NP
1. US
EPR primary containment analysis model development and benchmarking.
Entergy Operations Inc. (EOI)
1. River
Bend Station (RBS) Auxiliary Building (AB) GOTHIC model/analysis of loss
of HVAC transients. Preparation of RBS GOTHIC code Software Quality
Assurance Manual.
2. RBS
GOTHIC model/analysis of Containment Annulus and AB for Standby Gas
Treatment System (SGTS) draw down transients.
3. RBS
GOTHIC model/analysis of steam tunnel area steam leak detection system
response to design basis leaks.
4. RBS
GOTHIC model/analysis of primary containment (Mark III) response to
design basis Recirculation Line Break, Steam Line Break, and Small Break
LOCA. Benchmark with FSAR.
5. RBS
GOTHIC model/analysis of the Control Building Pressure Boundary to
support plant operability concerns.
6. RBS
GOTHIC model/analysis of Integrated Containment Annulus, AB, and Standby
Gas Treatment System (SGTS) for building positive pressure and draw down
transients. Preparation of Topical Report to document qualification of
GOTHIC code for RBS design basis calculations.
7.
RBS GOTHIC model/analysis of the Diesel Generator Building for loss of
HVAC transients.
8. Cooper
Nuclear Station (CNS) Reactor Building (RB) GOTHIC HELB analysis for
electrical EQ evaluation. Complete RB HELB analysis reconstitution and
EQ temperature and pressure profiles development. Thermal-lag
calculations for EQ components.
9. Waterford
3 GOTHIC model/analysis of Reactor Auxiliary Building for loss of HVAC
transients.
10.
Arkansas One GOTHIC model/analysis of Auxiliary Building for loss of
HVAC transients.
11.
Pilgrim Nuclear Power Station (PNPS) Drywell Transient Temperature
Analyses for Simulator Design.
Tennessee Valley Authority (TVA)
1.
Watts Bar Nuclear Plant (WBN) Unit 1 AB GOTHIC model/analysis of HELBs.
2.
Sequoyah Nuclear Plant (SQN) Units 1&2 AB GOTHIC model/analysis of HELBs.
3.
Browns Ferry Nuclear Plant (BFN) Units 2&3 Reactor Building (RB) GOTHIC
model/analysis of HELBs. Also EPU HELB analyses.
Progress Energy
1.
Brunswick Nuclear Plant (BNP). Reactor Building (RB) GOTHIC HELB
analysis for electrical EQ (MCC's) evaluations.
2.
BNP Reactor Building SGTS post-LOCA drawdown analysis.
3.
BNP post-LOCA transient MSIV discharge piping temperature analysis.
Nuclear Management Co. / Xcel Energy
1.
Kewaunee Nuclear Power Plant (KNPP) thermal-lag analyses for HELB events
in support of EQ evaluations of electrical components.
2. Monticello
Nuclear Generating Plant Reactor Building SGTS post-LOCA drawdown
analysis.
3. Monticello
Nuclear Generating Plant, post-LOCA transient MSIV discharge piping
temperature analysis.
Yankee Atomic Electric Company (YAEC)
1.
Maine Yankee (MY). Design review of Turbine Building GOTHIC HELB
analysis.
2. Vermont
Yankee (VY). Perform containment response GOTHIC analysis to Appendix R
reactor shutdown scenarios.
3. Maine
Yankee (MY). Design review of Protected Switchgear Room, Protected
Cable Tray Room, and Battery Room Loss of HVAC GOTHIC analysis.
4.
Seabrook. Perform design basis primary containment GOTHIC analysis.
5.
Maine Yankee (MY). Design review of Control Room Loss of HVAC GOTHIC
analysis.
6.
Maine Yankee (MY). Design review of Circulating Water Pumphouse Loss of
HVAC GOTHIC analysis.
7.
Vermont Yankee. Perform small break LOCA drywell heat-up GOTHIC
analysis.
General Electric Nuclear Energy
1.
BFN Units 2&3 Reactor Building GOTHIC model/analyses to support Power
Uprate project EQ projects. Included subdivided GOTHIC models to
support crack break detection.
Korea Power Engineering Company (KOPEC)
1. Preparation of Kori 1 & 2 GOTHIC HELB model outside containment.
HELB analysis and GOTHIC simulation training.
|